Key points for installing MPP power pipes
May 26,2026
The foundation is flat, without sharp hard objects, to avoid scratching the pipe.
The foundation is flat, without sharp hard objects, to avoid scratching the pipe.
During hot melt docking, the end face should be vertical and flat, and the temperature/time/pressure should be adjusted according to the specifications.
Minimum bending radius ≥ 75 times the pipe diameter to avoid dead bends.
Burial depth: sidewalk ≥ 0.7m, roadway ≥ 1.0m, heavy-duty area ≥ 1.2m.
Contact Us
Phone/WhatsApp
Address
Mijiawu Town, Xiong County, Xiong'an New Area, Hebei Province, China